Two-bedroom apartment in a newly built cooperative on Kavala Street, Haskovo
We present you an apartment located in the city of Haskovo on 6-8 Kavala Street. This is an apartment in a newly built building with an area of 91.09 sq.m., located on the first floor above shops. The apartment is fully oriented to the south, which provides excellent natural light and warmth throughout the day.
Main features of the property:
Spacious living room with access to a terrace: Perfect for relaxation and social moments.
Two bedrooms: Convenient for families or guests.
Bathroom with toilet: Practically distributed for everyday use.
Entrance hall: For a clear separation of the entrance area from the rest of the apartment.
🏡 Location:
The property is located in close proximity to a vegetable market, kindergarten and school - everything you need for a comfortable everyday life. In addition, it is located near the city center, which provides easy access to all city services and infrastructure.
💰 Price: 89,180 euros
Quality and construction technologies:
The building will be built according to European construction standards, using high-quality materials and innovative technologies:
Monolithic, reinforced concrete construction - provides a strong and durable foundation.
Masonry with Porotherm bricks from Wienerberger - the bricks have a built-in sound and heat insulation detail, which guarantees excellent energy efficiency, fire resistance and durability of the structure.
External facade - complete thermal insulation with quality non-combustible materials and high-class roof tiles.
Internal finishes - the walls are finished with machine gypsum plaster (in the bathrooms - with lime-cement plaster), and the apartment is offered with installed entrance armored doors and high-class PVC joinery, which provide reliable heat and sound insulation.
Installations - the flooring is made of cement screed, and all plumbing and electrical communications are performed in a plug and with separate batches for each object, with cables for internet and television laid.
Common areas - the spacious entrance area is luxuriously finished, and the building will have an elevator.
Completion date:
The building will be ready and will be issued with Act 16 by the end of December 2026, with the implementation being entrusted to a proven company with many successfully completed cooperatives and satisfied customers.
If you need additional information or would like to arrange a viewing, do not hesitate to contact us!
